Application.SplitTask Method (Project)

office 365 dev account|Last Updated: 6/12/2017
|
1 Contributor

Enters the interactive task split mode, enabling the user to manually create task splits.

Syntax

expression. SplitTask( ** Lock** )

expression A variable that represents an Application object.

Parameters

NameRequired/OptionalData TypeDescription
LockOptionalBooleanTrue if the task split pointer stays active after a split is made, enabling more task splits to be made. False if the pointer returns to normal after making a split. The default value is False.

Return Value

Boolean

Remarks

The SplitTask method requires user interaction before additional code can be executed. The SplitTask method is only available in Gantt views; it corresponds to the Split Task icon on the Task tab of the Ribbon.