Windows apps
Collapse the table of content
Expand the table of content
Information
The topic you requested is included in another documentation set. For convenience, it's displayed below. Choose Switch to see the topic in its original location.

EastAsianLunisolarCalendar::GetLeapMonth Method (Int32, Int32)

 

Calculates the leap month for the specified year and era.

Namespace:   System.Globalization
Assembly:  mscorlib (in mscorlib.dll)

public:
virtual int GetLeapMonth(
	int year,
	int era
) override

Parameters

year
Type: System::Int32

An integer that represents the year.

era
Type: System::Int32

An integer that represents the era.

Return Value

Type: System::Int32

A positive integer from 1 through 13 that indicates the leap month in the specified year and era.

-or-

Zero if this calendar does not support a leap month, or if the year and era parameters do not specify a leap year.

In a calendar that supports a leap month, the leap month can occur either after a particular month or after any month in a year. For example, the GetMonth method returns a number from 1 through 13 that indicates the month associated with a specified date. If there is a leap month between the eighth and ninth months of the year, the GetMonth method returns 8 for the eighth month, 9 for the leap eighth month, and 10 for the ninth month.

Universal Windows Platform
Available since 10
.NET Framework
Available since 2.0
Return to top
Show:
© 2017 Microsoft