Windows apps
Collapse the table of content
Expand the table of content
Information
The topic you requested is included in another documentation set. For convenience, it's displayed below. Choose Switch to see the topic in its original location.

UmAlQuraCalendar::IsLeapDay Method (Int32, Int32, Int32, Int32)

 

Determines whether the specified date is a leap day.

Namespace:   System.Globalization
Assembly:  mscorlib (in mscorlib.dll)

public:
virtual bool IsLeapDay(
	int year,
	int month,
	int day,
	int era
) override

Parameters

year
Type: System::Int32

A year.

month
Type: System::Int32

An integer from 1 through 12 that represents a month.

day
Type: System::Int32

An integer from 1 through 30 that represents a day.

era
Type: System::Int32

An era. Specify UmAlQuraCalendar.Eras[UmAlQuraCalendar.CurrentEra] or UmAlQuraEra.

Return Value

Type: System::Boolean

true if the specified day is a leap day; otherwise, false. The return value is always false because the UmAlQuraCalendar class does not support leap days.

Exception Condition
ArgumentOutOfRangeException

year, month, day, or era is outside the range supported by the UmAlQuraCalendar class.

A leap day is a day that occurs only in a leap year.

The following example calls the IsLeapDay method for the last day of the second month (February) for five years in each of the eras.

using namespace System;
using namespace System::Globalization;
int main()
{

   // Creates and initializes a HijriCalendar.
   HijriCalendar^ myCal = gcnew HijriCalendar;

   // Creates a holder for the last day of the second month (February).
   int iLastDay;

   // Displays the header.
   Console::Write( "YEAR\t" );
   for ( int y = 1421; y <= 1425; y++ )
      Console::Write( "\t {0}", y );
   Console::WriteLine();

   // Checks five years in the current era.
   Console::Write( "CurrentEra:" );
   for ( int y = 1421; y <= 1425; y++ )
   {
      iLastDay = myCal->GetDaysInMonth( y, 2, HijriCalendar::CurrentEra );
      Console::Write( "\t {0}", myCal->IsLeapDay( y, 2, iLastDay, HijriCalendar::CurrentEra ) );

   }
   Console::WriteLine();

   // Checks five years in each of the eras.
   for ( int i = 0; i < myCal->Eras->Length; i++ )
   {
      Console::Write( "Era {0}:\t", myCal->Eras[ i ] );
      for ( int y = 1421; y <= 1425; y++ )
      {
         iLastDay = myCal->GetDaysInMonth( y, 2, myCal->Eras[ i ] );
         Console::Write( "\t {0}", myCal->IsLeapDay( y, 2, iLastDay, myCal->Eras[ i ] ) );

      }
      Console::WriteLine();

   }
}

/*
This code produces the following output.

YEAR            1421    1422    1423    1424    1425
CurrentEra:     False   False   False   False   False
Era 1:          False   False   False   False   False

*/

Universal Windows Platform
Available since 10
.NET Framework
Available since 2.0
Silverlight
Available since 2.0
Windows Phone Silverlight
Available since 7.0
Return to top
Show:
© 2017 Microsoft