This documentation is archived and is not being maintained.

ProjectDataSet.ProjectRow.IsPROJ_OPT_MULT_CRITICAL_PATHSNull Method

Office 2007

Determines whether the PROJ_OPT_MULT_CRITICAL_PATHS field is a null reference (Nothing in Visual Basic).

Namespace:  WebSvcProject
Assembly:  ProjectServerWebServices (in ProjectServerWebServices.dll)

public bool IsPROJ_OPT_MULT_CRITICAL_PATHSNull()

Return Value

Type: System.Boolean
true if PROJ_OPT_MULT_CRITICAL_PATHS is a null reference (Nothing in Visual Basic).
Show: