EastAsianLunisolarCalendar.GetLeapMonth(Int32, Int32) Method

Definition

Calculates the leap month for the specified year and era.

public:
 override int GetLeapMonth(int year, int era);
public override int GetLeapMonth (int year, int era);
override this.GetLeapMonth : int * int -> int
Public Overrides Function GetLeapMonth (year As Integer, era As Integer) As Integer

Parameters

year
Int32

An integer that represents the year.

era
Int32

An integer that represents the era.

Returns

A positive integer from 1 through 13 that indicates the leap month in the specified year and era.

-or-

Zero if this calendar does not support a leap month, or if the year and era parameters do not specify a leap year.

Remarks

In a calendar that supports a leap month, the leap month can occur either after a particular month or after any month in a year. For example, the GetMonth method returns a number from 1 through 13 that indicates the month associated with a specified date. If there is a leap month between the eighth and ninth months of the year, the GetMonth method returns 8 for the eighth month, 9 for the leap eighth month, and 10 for the ninth month.

Applies to