SalesATPApplyDemandTimeFence Extended Data Type [AX 2012]
Help Text:
Time period in days, going forward from today, when delayed demand orders are considered as issues. This applies only if the delivery date control is set to ATP or ATP + Issue margin.
Configuration Key: SalesDeliveryDateControl
Alignment: Auto
Base Type: Integer
Extends: SalesATPTimeFence Extended Data Type
Configuration Key: SalesDeliveryDateControl
Alignment: Auto
Base Type: Integer
Extends: SalesATPTimeFence Extended Data Type
Allow Negative:
No (non-default)
Analysis Default Sort Property: Ascending
Analysis Default Total Property: No
Analysis Grouping Property: Auto
Analysis Usage Property: None
Auto
Displace Negative: Auto
ID: 6987 (non-default)
Model: Foundation (non-default)
Rotate Sign: Auto
Show Zero: Auto
Sign Display: Auto
Analysis Default Sort Property: Ascending
Analysis Default Total Property: No
Analysis Grouping Property: Auto
Analysis Usage Property: None
Auto
Displace Negative: Auto
ID: 6987 (non-default)
Model: Foundation (non-default)
Rotate Sign: Auto
Show Zero: Auto
Sign Display: Auto
Community Additions
ADD
Show: