RPayCalculate.correctedPeriod Method [AX 2012]
Gets or sets the corrected period.
public ReportPeriod_RU correctedPeriod([ReportPeriod_RU _correctedPeriod])
Run On
ServerParameters
- _correctedPeriod
- Type: ReportPeriod_RU Extended Data Type
The corrected period, set if specified.
Community Additions
ADD
Show: