ReqPlanData.schedReqDateReceipt Method [AX 2012]
Forward schedules a date on the calendar based on the receipt margin of the specified requirements.
public ReqDate schedReqDateReceipt(ReqDateDlv _reqDateDlv, ReqSetupDim _setupDim)
Run On
CalledParameters
- _reqDateDlv
- Type: ReqDateDlv Extended Data Type
The requirement date to use as starting date for the scheduling.
- _setupDim
- Type: ReqSetupDim Class
The dimension-based planned order requirement setup.
Community Additions
ADD
Show: