ReqPlanData.schedReqDateOrder Method [AX 2012]

Backwards schedules a date on the calendar based on the order margin of the specified requirements.

NoteNote

The syntax of this method varies based on the version of Microsoft Dynamics AX that you are using.


  Microsoft Dynamics AX 2012 R3
          public ReqDateOrder schedReqDateOrder(
            ReqDateOrder _reqDateOrder, 
            ReqSetupDim _setupDim, 
           [CalendarId _secondaryCalendarId])

  Microsoft Dynamics AX 2012 R2 (SYS)
          public ReqDateOrder schedReqDateOrder(
            ReqDateOrder _reqDateOrder, 
            ReqSetupDim _setupDim, 
           [CalendarId _sekundaryCalendarId])

  Microsoft Dynamics AX 2012 Feature Pack (SYS)
          public ReqDateOrder schedReqDateOrder(
            ReqDateOrder _reqDateOrder, 
            ReqSetupDim _setupDim, 
           [CalendarId _sekundaryCalendarId])

  Microsoft Dynamics AX 2012 (FPK)
          public ReqDateOrder schedReqDateOrder(
            ReqDateOrder _reqDateOrder, 
            ReqSetupDim _setupDim, 
           [CalendarId _sekundaryCalendarId])

  Microsoft Dynamics AX 2012 (SYS)
          public ReqDateOrder schedReqDateOrder(
            ReqDateOrder _reqDateOrder, 
            ReqSetupDim _setupDim, 
           [CalendarId _sekundaryCalendarId])

Run On

Called

Parameters

_reqDateOrder
Type: ReqDateOrder Extended Data Type
The requirement date to use as starting date for the scheduling.
_setupDim
Type: ReqSetupDim Class
The dimension-based planned order requirement setup.
_secondaryCalendarId
Type: CalendarId Extended Data Type
The ID of the secondary calendar to use.

Return Value

Type: ReqDateOrder Extended Data Type
A date that complies with the parameters.