ReqPlanData.schedReqDateIssue Method [AX 2012]

Backwards schedules a date on the calendar based on the issue margin of the specified requirements.

public ReqDate schedReqDateIssue(ReqDateDlv _reqDateDlv, ReqSetupDim _setupDim)

Run On

Called

Parameters

_reqDateDlv
Type: ReqDateDlv Extended Data Type
The requirement date to use as starting date for the scheduling.
_setupDim
Type: ReqSetupDim Class
The dimension-based planned order requirement setup.

Return Value

Type: ReqDate Extended Data Type
A date that complies with the parameters.

Community Additions

ADD
Show: