ReqDemPlanDateConverter::getPeriodEndDate Method [AX 2012]

Returns the actual end date for a period.

client server public static date getPeriodEndDate(date _dateInsidePeriod, ReqDemPlanDateGranularity _dateGranularity)

Run On

Called

Parameters

_dateInsidePeriod
Type: date
Input date for calculating actual end date.
_dateGranularity
Type: ReqDemPlanDateGranularity Enumeration
The date granularity of enum ReqDemPlanDateGranularity.

Return Value

Type: date
The actual end date.

ExceptionCondition
Error

If the forecast bucket is not correctly specified it throws an error.

Show: