ProjTrans.wipPeriod Method [AX 2012]
Retrieves the start date of the estimate period for this transaction.
public ProjPeriodFromWIP wipPeriod()
Run On
CalledReturn Value
Type: ProjPeriodFromWIP Extended Data TypeA nullNothingnullptrunita null reference (Nothing in Visual Basic) date.
Show: