ProjResourceAvailabilityView.dateRangeValidate Method [AX 2012]

Date range validate.

protected boolean dateRangeValidate(FormDateControl dateControl)

Run On

Called

Parameters

dateControl
Type: FormDateControl Class
Date control.

Return Value

Type: boolean
true if control is validate.

Community Additions

ADD
Show: