ProjResourceAvailabilityView.dateRangeModified Method [AX 2012]

Date range modified method.

protected boolean dateRangeModified(FormDateControl dateControl)

Run On

Called

Parameters

dateControl
Type: FormDateControl Class
Date control.

Return Value

Type: boolean
true if date control is modified.

Community Additions

ADD
Show: