ProdUpdCostEstimation.setBOMRawMaterialDate Method [AX 2012]
Sets the scheduled dates and times for the raw materials as estimated during production.
protected void setBOMRawMaterialDate(
ProdTable _prodTable,
ProdBOM _prodBOM,
ProdRoute _prodRoute)
Run On
ServerParameters
- _prodTable
- Type: ProdTable Table
The production order that will consume the materials.
- _prodBOM
- Type: ProdBOM Table
The bill of materials that specifies the raw material list.
- _prodRoute
- Type: ProdRoute Table
The route that specifies the consumption times of the raw materials.
Community Additions
ADD
Show: