ProdUpdCostEstimation.setBOMRawMaterialDate Method [AX 2012]

Sets the scheduled dates and times for the raw materials as estimated during production.

protected void setBOMRawMaterialDate(
    ProdTable _prodTable, 
    ProdBOM _prodBOM, 
    ProdRoute _prodRoute)

Run On

Server

Parameters

_prodTable
Type: ProdTable Table
The production order that will consume the materials.
_prodBOM
Type: ProdBOM Table
The bill of materials that specifies the raw material list.
_prodRoute
Type: ProdRoute Table
The route that specifies the consumption times of the raw materials.

Community Additions

ADD
Show: