public boolean runReportFinished(
ProdParmReportFinished _prodParmReportFinished,
[boolean _ask,
RunbaseRecsMapable _multi,
boolean _runningPreviousJob])
Microsoft Dynamics AX 2012 R2 (SYS)
public boolean runReportFinished(
ProdParmReportFinished _prodParmReportFinished,
[boolean _ask,
RunbaseRecsMapable _multi])
Microsoft Dynamics AX 2012 Feature Pack (SYS)
public boolean runReportFinished(
ProdParmReportFinished _prodParmReportFinished,
[boolean _ask,
RunbaseRecsMapable _multi])
Microsoft Dynamics AX 2012 (FPK)
public boolean runReportFinished(
ProdParmReportFinished _prodParmReportFinished,
[boolean _ask,
RunbaseRecsMapable _multi])
Microsoft Dynamics AX 2012 (SYS)
public boolean runReportFinished(
ProdParmReportFinished _prodParmReportFinished,
[boolean _ask,
RunbaseRecsMapable _multi])
Run On
CalledParameters
- _prodParmReportFinished
- Type: ProdParmReportFinished Table
The parameters to use to report a production order as finished.
- _ask
- Type: boolean
A value of TRUE indicates that method will only check whether reporting as finished is allowed. A value of FALSE indicates that the method will also perform the report as finished.; optional
- _multi
- Type: RunbaseRecsMapable Interface
A Boolean value that indicates whether to report multiple production orders as finished at once; optional.
- _runningPreviousJob
- Type: boolean
Indicates if this method has been triggered by a change to a higher status: optional.
Return Value
Type: booleantrue if reporting as finished is allowed for a production order status; otherwise, false.