ProdStatusType.runPrevJobReportFinished Method [AX 2012]

Runs the jobs to update the prod order status to statuses preceding ReportedFinished.

protected void runPrevJobReportFinished(ProdParmReportFinished _prodParmReportFinished, RunbaseRecsMapable _multi)

Run On

Called

Parameters

_prodParmReportFinished
Type: ProdParmReportFinished Table
The parameters to use to report a production order as finished.
_multi
Type: RunbaseRecsMapable Interface
A Boolean value that indicates whether to report multiple production orders as finished at once.

Community Additions

ADD
Show: