ProdStatusType.runPrevJobReportFinished Method [AX 2012]
Runs the jobs to update the prod order status to statuses preceding ReportedFinished.
protected void runPrevJobReportFinished(ProdParmReportFinished _prodParmReportFinished, RunbaseRecsMapable _multi)
Run On
CalledParameters
- _prodParmReportFinished
- Type: ProdParmReportFinished Table
The parameters to use to report a production order as finished.
- _multi
- Type: RunbaseRecsMapable Interface
A Boolean value that indicates whether to report multiple production orders as finished at once.
Community Additions
ADD
Show: