ProdRouteJobInfo.checkOverlapSubsequenceCurrentOperation Method [AX 2012]

Indicates whether a job can be part of an overlap subsequence in which the overlap job belongs to the current operation.

protected boolean checkOverlapSubsequenceCurrentOperation()

Run On

Called

Return Value

Type: boolean
true if the job can be part of an overlap subsequence in which the overlap job belongs to the current operation; otherwise, false.

Community Additions

ADD
Show: