PMFSeqAcceptFirmChanges.updateReqPo Method [AX 2012]

Updates the ReqPO record upon confirmation of the sequenced planned order.

protected ReqPO updateReqPo(ReqRoute _reqRoute)

Run On

Called

Parameters

_reqRoute
Type: ReqRoute Table
The requirement route to confirm.

Return Value

Type: ReqPO Table
The ReqPO record that was updated; an empty buffer if the _reqRoute parameter does not refer to a valid planned order.

Community Additions

ADD
Show: