PMFSeqAcceptFirmChanges.updateReqPo Method [AX 2012]
Updates the ReqPO record upon confirmation of the sequenced planned order.
protected ReqPO updateReqPo(ReqRoute _reqRoute)
Run On
CalledParameters
- _reqRoute
- Type: ReqRoute Table
The requirement route to confirm.
Return Value
Type: ReqPO TableThe ReqPO record that was updated; an empty buffer if the _reqRoute parameter does not refer to a valid planned order.
Community Additions
ADD
Show: