PMFSeqAcceptChanges.updateReqPo Method [AX 2012]

Updates the specified ReqPO record when confirmation of the specified sequenced planned order is received.

protected ReqPO updateReqPo(ReqRoute _reqRoute)

Run On

Called

Parameters

_reqRoute
Type: ReqRoute Table
The requirement route that you want to confirm.

Return Value

Type: ReqPO Table
The ReqPO record that was updated, or an empty buffer if the _reqRoute Parameter does not refer to a valid planned order.

Community Additions

ADD
Show: