PMFSeqAcceptChanges.updateReqPo Method [AX 2012]
Updates the specified ReqPO record when confirmation of the specified sequenced planned order is received.
protected ReqPO updateReqPo(ReqRoute _reqRoute)
Run On
CalledParameters
- _reqRoute
- Type: ReqRoute Table
The requirement route that you want to confirm.
Return Value
Type: ReqPO TableThe ReqPO record that was updated, or an empty buffer if the _reqRoute Parameter does not refer to a valid planned order.
Community Additions
ADD
Show: