Application.SplitTask Method (Project)
Enters the interactive task split mode, enabling the user to manually create task splits.
Syntax
expression .SplitTask(Lock)
expression A variable that represents an Application object.
Parameters
Name |
Required/Optional |
Data Type |
Description |
---|---|---|---|
Lock |
Optional |
Boolean |
True if the task split pointer stays active after a split is made, enabling more task splits to be made. False if the pointer returns to normal after making a split. The default value is False. |
Return Value
Boolean
Remarks
The SplitTask method requires user interaction before additional code can be executed. The SplitTask method is only available in Gantt views; it corresponds to the Split Task icon on the Task tab of the Ribbon.