DAX Error: The calculation could not be completed. The formula for this calculation contains a time-intelligence function. Verify the column specified for the ‘date’ argument to the time-intelligence function contains a contiguous set of dates.
DAX Error: The calculation could not be completed. The DAX formula for this calculation contains a time-intelligence function. Verify the column specified for the ‘date’ argument to the time-intelligence function contains a contiguous set of dates. For more information, see http://go.microsoft.com/fwlink/p/?LinkId=398094.
Instweakert section body here.
Subsection Heading
Insert subsection body here.
Community Additions
ADD
Show: