Setting the Active Configuration for a Project (Windows CE 5.0)

Send Feedback

You can change the active configuration used for a project on the workspace or OS design level.

To set the active configuration

  1. From the View menu, choose Workspace.

  2. In the Workspace window, choose the OSDesignView tab.

  3. From the Build OS menu, choose Set Active Configuration and then select a configuration.

    – or –

    On the Build toolbar, in the Select Active Configuration list, select a configuration.

To view the Build toolbar, point to a blank area on the menu bar, right-click, and choose Build.

See Also

Projects | How to Decrease Run-Time Image Size on a CEPC

Send Feedback on this topic to the authors

Feedback FAQs

© 2006 Microsoft Corporation. All rights reserved.