MCRContinuitySynchronization.getShipDate Method [AX 2012]
Determines the ship date based on the payment schedule value.
public DlvDate getShipDate(MCRContinuityCustLine _mcrContinuityCustLine)
Run On
CalledParameters
- _mcrContinuityCustLine
- Type: MCRContinuityCustLine Table
The continuity cust line used to calculate the ship date.
Community Additions
ADD
Show: