Posted Asm. Order Statistics Window
Specifies statistical information about the posted assembly order’s direct material and resource costs and overhead.
Note
Amounts in the statistics window are in the same currency as the posted assembly order.
For each cost type, the information is provided in the following columns.
Column | Description |
---|---|
Standard Cost |
Based on the standard unit cost from the item card of the assembly item and the order quantity. |
Expected Cost |
Based on a roll-up of the cost amount of assembly order lines, components (material), and resources. |
Actual Cost |
Based on the Consumed Quantity x Unit Cost of components and resources. |
Dev % |
Deviation in percent between standard cost and actual cost. |
Variance |
Variance between standard cost and actual cost. |
Assembly order statistics are provided in the following lines.
Line | Description |
---|---|
Material Cost |
Shows the material cost amount of all assembly order lines of type Item in the assembly order. |
Resource Cost |
Shows the material cost amount of all assembly order lines of type Resource in the assembly order. |
Resource Overhead |
Shows the resource overhead amount of all assembly order lines of type Resource. |
Assembly Overhead |
Shows the overhead amount of the entire assembly order. |
Total Cost |
Shows the sum of the lines in each column. |
Tip
For more information on how to navigate in the user interface, see Work with Microsoft Dynamics NAV. For assistance in finding specific pages, see Search.
See Also
Reference
Posted Assembly Order
Assembly Order
Other Resources
Standard Cost
Actual Cost
Variance Type
Design Details: Assembly Order Posting