3.3.7.15 Begin Remote LU Initiated Synchronization

The Begin Remote LU Initiated Synchronization event MUST be signaled with the following argument:

  • An LU Pair object

If the Begin Remote LU Initiated Synchronization event is signaled, the Transaction Manager Communicating with an LU 6.2 Implementation Facet MUST perform the following actions:

  • If the LU Pair Recovery State field of the provided LU Pair object is set to either Not Synchronized or Inconsistent:

    • If the Is Warm flag of the provided LU Pair object is set to TRUE:

      • Set the LU Pair Recovery State field of the provided LU Pair object to Synchronizing Have Remote Name.

    • Otherwise:

      • Set the LU Pair Recovery State field of the provided LU Pair object to Synchronizing No Remote Name.

Show: