AssetReductionEntryPeriodAmt_JP Extended Data Type [AX 2012]
Help Text:
The period of time that a subsidy is withheld on the completion of some specified conditions.
Configuration Key: Asset
Alignment: Auto
Base Type: Integer
Configuration Key: Asset
Alignment: Auto
Base Type: Integer
Show: