ProjEstimateMethod Enumeration

Id: 523

Help: Which estimates from the previous period are to form the basis of the estimates of this period?

Label: Cost to complete method

Style: Combo box

Configuration key: ProjAdvEstimate

Settings shown are initial values.

Value

Description

TotalEstimate

2

Total

RemainingEstimate

1

Forecasting

PreviousEstimate

4

As previous estimate

TotalEstimateActual

0

Set cost to complete to zero