This documentation is archived and is not being maintained.

EastAsianLunisolarCalendar.GetDaysInMonth Method (Int32, Int32, Int32)

Calculates the number of days in the specified month of the specified year and era.

Namespace:  System.Globalization
Assembly:  mscorlib (in mscorlib.dll)

public override int GetDaysInMonth(
	int year,
	int month,
	int era
)

Parameters

year
Type: System.Int32

An integer that represents the year.

month
Type: System.Int32

An integer from 1 through 12 in a common year, or 1 through 13 in a leap year, that represents the month.

era
Type: System.Int32

An integer that represents the era.

Return Value

Type: System.Int32
The number of days in the specified month of the specified year and era.

ExceptionCondition
ArgumentOutOfRangeException

year, month, or era is outside the range supported by this calendar.

If the month parameter is the second month, the GetDaysInMonth method returns 28 or 29, depending on whether the year parameter is a leap year.

Windows 7, Windows Vista, Windows XP SP2, Windows XP Media Center Edition, Windows XP Professional x64 Edition, Windows XP Starter Edition, Windows Server 2008 R2, Windows Server 2008, Windows Server 2003, Windows Server 2000 SP4, Windows Millennium Edition, Windows 98

The .NET Framework and .NET Compact Framework do not support all versions of every platform. For a list of the supported versions, see .NET Framework System Requirements.

.NET Framework

Supported in: 3.5, 3.0, 2.0
Show: