ProjectTaskFields enumeration (JavaScript API for Office v1.1)

JavaScript API for Office v1.1

Specifies the task fields that are available as a parameter for the getTaskFieldAsync method.

Last modified: June 25, 2014

Members

Microsoft.Office.WebExtension.ProjectTaskFields={
    ActualCost: 0, 
    ActualDuration: 1, 
    ActualFinish: 2, 
    ActualOvertimeCost: 3, 
    ActualOvertimeWork: 4, 
    ActualStart: 5, 
    ActualWork: 6, 
    Text1: 7, 
    Text10: 8, 
    Finish10: 9, 
    Start10: 10, 
    Text11: 11, 
    Text12: 12, 
    Text13: 13, 
    Text14: 14, 
    Text15: 15, 
    Text16: 16, 
    Text17: 17, 
    Text18: 18, 
    Text19: 19, 
    Finish1: 20, 
    Start1: 21, 
    Text2: 22, 
    Text20: 23, 
    Text21: 24, 
    Text22: 25, 
    Text23: 26, 
    Text24: 27, 
    Text25: 28, 
    Text26: 29, 
    Text27: 30, 
    Text28: 31, 
    Text29: 32, 
    Finish2: 33, 
    Start2: 34, 
    Text3: 35, 
    Text30: 36, 
    Finish3: 37, 
    Start3: 38, 
    Text4: 39, 
    Finish4: 40, 
    Start4: 41, 
    Text5: 42, 
    Finish5: 43, 
    Start5: 44, 
    Text6: 45, 
    Finish6: 46, 
    Start6: 47, 
    Text7: 48, 
    Finish7: 49, 
    Start7: 50, 
    Text8: 51, 
    Finish8: 52, 
    Start8: 53, 
    Text9: 54, 
    Finish9: 55, 
    Start9: 56, 
    Baseline10BudgetCost: 57, 
    Baseline10BudgetWork: 58, 
    Baseline10Cost: 59, 
    Baseline10Duration: 60, 
    Baseline10Finish: 61, 
    Baseline10FixedCost: 62, 
    Baseline10FixedCostAccrual: 63, 
    Baseline10Start: 64, 
    Baseline10Work: 65, 
    Baseline1BudgetCost: 66, 
    Baseline1BudgetWork: 67, 
    Baseline1Cost: 68, 
    Baseline1Duration: 69, 
    Baseline1Finish: 70, 
    Baseline1FixedCost: 71, 
    Baseline1FixedCostAccrual: 72, 
    Baseline1Start: 73, 
    Baseline1Work: 74, 
    Baseline2BudgetCost: 75, 
    Baseline2BudgetWork: 76, 
    Baseline2Cost: 77, 
    Baseline2Duration: 78, 
    Baseline2Finish: 79, 
    Baseline2FixedCost: 80, 
    Baseline2FixedCostAccrual: 81, 
    Baseline2Start: 82, 
    Baseline2Work: 83, 
    Baseline3BudgetCost: 84, 
    Baseline3BudgetWork: 85, 
    Baseline3Cost: 86, 
    Baseline3Duration: 87, 
    Baseline3Finish: 88, 
    Baseline3FixedCost: 89, 
    Baseline3FixedCostAccrual: 90, 
    Basline3Start: 91, 
    Baseline3Work: 92, 
    Baseline4BudgetCost: 93, 
    Baseline4BudgetWork: 94, 
    Baseline4Cost: 95, 
    Baseline4Duration: 96, 
    Baseline4Finish: 97, 
    Baseline4FixedCost: 98, 
    Baseline4FixedCostAccrual: 99, 
    Baseline4Start: 100, 
    Baseline4Work: 101, 
    Baseline5BudgetCost: 102, 
    Baseline5BudgetWork: 103, 
    Baseline5Cost: 104, 
    Baseline5Duration: 105, 
    Baseline5Finish: 106, 
    Baseline5FixedCost: 107, 
    Baseline5FixedCostAccrual: 108, 
    Baseline5Start: 109, 
    Baseline5Work: 110, 
    Baseline6BudgetCost: 111, 
    Baseline6BudgetWork: 112, 
    Baseline6Cost: 113, 
    Baseline6Duration: 114, 
    Baseline6Finish: 115, 
    Baseline6FixedCost: 116, 
    Baseline6FixedCostAccrual: 117, 
    Baseline6Start: 118, 
    Baseline6Work: 119, 
    Baseline7BudgetCost: 120, 
    Baseline7BudgetWork: 121, 
    Baseline7Cost: 122, 
    Baseline7Duration: 123, 
    Baseline7Finish: 124, 
    Baseline7FixedCost: 125, 
    Baseline7FixedCostAccrual: 126, 
    Baseline7Start: 127, 
    Baseline7Work: 128, 
    Baseline8BudgetCost: 129, 
    Baseline8BudgetWork: 130, 
    Baseline8Cost: 131, 
    Baseline8Duration: 132, 
    Baseline8Finish: 133, 
    Baseline8FixedCost: 134, 
    Baseline8FixedCostAccrual: 135, 
    Baseline8Start: 136, 
    Baseline8Work: 137, 
    Baseline9BudgetCost: 138, 
    Baseline9BudgetWork: 139, 
    Baseline9Cost: 140, 
    Baseline9Duration: 141, 
    Baseline9Finish: 142, 
    Baseline9FixedCost: 143, 
    Baseline9FixedCostAccrual: 144, 
    Baseline9Start: 145, 
    Baseline9Work: 146, 
    BaselineBudgetCost: 147, 
    BaselineBudgetWork: 148, 
    BaselineCost: 149, 
    BaselineDuration: 150, 
    BaselineFinish: 151, 
    BaselineFixedCost: 152, 
    BaselineFixedCostAccrual: 153, 
    BaselineStart: 154, 
    BaselineWork: 155, 
    BudgetCost: 156, 
    BudgetWork: 157, 
    TaskCalendarGUID: 158, 
    ConstraintDate: 159, 
    ConstraintType: 160, 
    Cost1: 161, 
    Cost10: 162, 
    Cost2: 163, 
    Cost3: 164, 
    Cost4: 165, 
    Cost5: 166, 
    Cost6: 167, 
    Cost7: 168, 
    Cost8: 169, 
    Cost9: 170, 
    Date1: 171, 
    Date10: 172, 
    Date2: 173, 
    Date3: 174, 
    Date4: 175, 
    Date5: 176, 
    Date6: 177, 
    Date7: 178, 
    Date8: 179, 
    Date9: 180, 
    Deadline: 181, 
    Duration1: 182, 
    Duration10: 183, 
    Duration2: 184, 
    Duration3: 185, 
    Duration4: 186, 
    Duration5: 187, 
    Duration6: 188, 
    Duration7: 189, 
    Duration8: 190, 
    Duration9: 191, 
    Duration: 192, 
    EarnedValueMethod: 193, 
    FinishSlack: 194, 
    FixedCost: 195, 
    FixedCostAccrual: 196, 
    Flag10: 197, 
    Flag1: 198, 
    Flag11: 199, 
    Flag12: 200, 
    Flag13: 201, 
    Flag14: 202, 
    Flag15: 203, 
    Flag16: 204, 
    Flag17: 205, 
    Flag18: 206, 
    Flag19: 207, 
    Flag2: 208, 
    Flag20: 209, 
    Flag3: 210, 
    Flag4: 211, 
    Flag5: 212, 
    Flag6: 213, 
    Flag7: 214, 
    Flag8: 215, 
    Flag9: 216, 
    FreeSlack: 217, 
    HasRollupSubTasks: 218, 
    ID: 219, 
    Name: 220, 
    Notes: 221, 
    Number1: 222, 
    Number10: 223, 
    Number11: 224, 
    Number12: 225, 
    Number13: 226, 
    Number14: 227, 
    Number15: 228, 
    Number16: 229, 
    Number17: 230, 
    Number18: 231, 
    Number19: 232, 
    Number2: 233, 
    Number20: 234, 
    Number3: 235, 
    Number4: 236, 
    Number5: 237, 
    Number6: 238, 
    Number7: 239, 
    Number8: 240, 
    Number9: 241, 
    ScheduledDuration: 242, 
    ScheduledFinish: 243, 
    ScheduledStart: 244, 
    OutlineLevel: 245, 
    OvertimeCost: 246, 
    OvertimeWork: 247, 
    PercentComplete: 248, 
    PercentWorkComplete: 249, 
    Predecessors: 250, 
    PreleveledFinish: 251, 
    PreleveledStart: 252, 
    Priority: 253, 
    Active: 254, 
    Critical: 255, 
    Milestone: 256, 
    Overallocated: 257, 
    IsRollup: 258, 
    Summary: 259, 
    RegularWork: 260, 
    RemainingCost: 261, 
    RemainingDuration: 262, 
    RemainingOvertimeCost: 263, 
    RemainingWork: 264, 
    ResourceNames: 265, 
    ResourceNames_deprecated: 266, 
    Cost: 267, 
    Finish: 268, 
    Start: 269, 
    Work: 270, 
    StartSlack: 271, 
    Status: 272, 
    Successors: 273, 
    StatusManager: 274, 
    TotalSlack: 275, 
    TaskGUID: 276, 
    Type: 277, 
    WBS: 278, 
    WBSPREDECESSORS: 279, 
    WBSSUCCESSORS: 280, 
    WSSID: 281
}

The ProjectTaskFields enumeration contains the following members.

Name

Value

Description

ActualCost

0

The current actual cost for the task.

ActualDuration

1

The actual duration of the task, in minutes.

ActualFinish

2

The actual finish date of the task.

ActualOvertimeCost

3

The actual overtime cost for the task.

ActualOvertimeWork

4

The actual overtime work for the task, in minutes.

ActualStart

5

The actual start date of the task.

ActualWork

6

The actual work for the task, in minutes.

Text1

7

A text field for the task.

Text10

8

A text field for the task.

Finish10

9

A finish field for the task.

Start10

10

A start field for the task.

Text11

11

A text field for the task.

Text12

12

A text field for the task.

Text13

13

A text field for the task.

Text14

14

A text field for the task.

Text15

15

A text field for the task.

Text16

16

A text field for the task.

Text17

17

A text field for the task.

Text18

18

A text field for the task.

Text19

19

A text field for the task.

Finish1

20

A finish field for the task.

Start1

21

A start field for the task.

Text2

22

A text field for the task.

Text20

23

A text field for the task.

Text21

24

A text field for the task.

Text22

25

A text field for the task.

Text23

26

A text field for the task.

Text24

27

A text field for the task.

Text25

28

A text field for the task.

Text26

29

A text field for the task.

Text27

30

A text field for the task.

Text28

31

A text field for the task.

Text29

32

A text field for the task.

Finish2

33

A finish field for the task.

Start2

34

A start field for the task.

Text3

35

A text field for the task.

Text30

36

A text field for the task.

Finish3

37

A finish field for the task.

Start3

38

A start field for the task.

Text4

39

A text field for the task.

Finish4

40

A finish field for the task.

Start4

41

A start field for the task.

Text5

42

A text field for the task.

Finish5

43

A finish field for the task.

Start5

44

A start field for the task.

Text6

45

A text field for the task.

Finish6

46

A finish field for the task.

Start6

47

A start field for the task.

Text7

48

A text field for the task.

Finish7

49

A finish field for the task.

Start7

50

A start field for the task.

Text8

51

A text field for the task.

Finish8

52

A finish field for the task.

Start8

53

A start field for the task.

Text9

54

A text field for the task.

Finish9

55

A finish field for the task.

Start9

56

A start field for the task.

Baseline10BudgetCost

57

The budget cost for the baseline task.

Baseline10BudgetWork

58

The budget work for the baseline task, in hours.

Baseline10Cost

59

The cost for the baseline task.

Baseline10Duration

60

The duration for the baseline task, in minutes.

Baseline10Finish

61

The finish date for the baseline task.

Baseline10FixedCost

62

The fixed cost of any non-resource expense for the baseline task.

Baseline10FixedCostAccrual

63

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline10Start

64

The start date for the baseline task.

Baseline10Work

65

The total person-hours scheduled for the baseline task, in minutes.

Baseline1BudgetCost

66

The budget cost for the baseline task.

Baseline1BudgetWork

67

The budget work for the baseline task, in hours.

Baseline1Cost

68

The cost for the baseline task.

Baseline1Duration

69

The duration for the baseline task, in minutes.

Baseline1Finish

70

The finish date for the baseline task.

Baseline1FixedCost

71

The fixed cost of any non-resource expense for the baseline task.

Baseline1FixedCostAccrual

72

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline1Start

73

The start date for the baseline task.

Baseline1Work

74

The total person-hours scheduled for the baseline task, in minutes.

Baseline2BudgetCost

75

The budget cost for the baseline task.

Baseline2BudgetWork

76

The budget work for the baseline task, in hours.

Baseline2Cost

77

The cost for the baseline task.

Baseline2Duration

78

The duration for the baseline task, in minutes.

Baseline2Finish

79

The finish date for the baseline task.

Baseline2FixedCost

80

The fixed cost of any non-resource expense for the baseline task.

Baseline2FixedCostAccrual

81

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline2Start

82

The start date for the baseline task.

Baseline2Work

83

The total person-hours scheduled for the baseline task, in minutes.

Baseline3BudgetCost

84

The budget cost for the baseline task.

Baseline3BudgetWork

85

The budget work for the baseline task, in hours.

Baseline3Cost

86

The cost for the baseline task.

Baseline3Duration

87

The duration for the baseline task, in minutes.

Baseline3Finish

88

The finish date for the baseline task.

Baseline3FixedCost

89

The fixed cost of any non-resource expense for the baseline task.

Baseline3FixedCostAccrual

90

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline3Start

91

The start date for the baseline task.

Baseline3Work

92

The total person-hours scheduled for the baseline task, in minutes.

Baseline4BudgetCost

93

The budget cost for the baseline task.

Baseline4BudgetWork

94

The budget work for the baseline task, in hours.

Baseline4Cost

95

The cost for the baseline task.

Baseline4Duration

96

The duration for the baseline task, in minutes.

Baseline4Finish

97

The finish date for the baseline task.

Baseline4FixedCost

98

The fixed cost of any non-resource expense for the baseline task.

Baseline4FixedCostAccrual

99

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline4Start

100

The start date for the baseline task.

Baseline4Work

101

The total person-hours scheduled for the baseline task, in minutes.

Baseline5BudgetCost

102

The budget cost for the baseline task.

Baseline5BudgetWork

103

The budget work for the baseline task, in hours.

Baseline5Cost

104

The cost for the baseline task.

Baseline5Duration

105

The duration for the baseline task, in minutes.

Baseline5Finish

106

The finish date for the baseline task.

Baseline5FixedCost

107

The fixed cost of any non-resource expense for the baseline task.

Baseline5FixedCostAccrual

108

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline5Start

109

The start date for the baseline task.

Baseline5Work

110

The total person-hours scheduled for the baseline task, in minutes.

Baseline6BudgetCost

111

The budget cost for the baseline task.

Baseline6BudgetWork

112

The budget work for the baseline task, in hours.

Baseline6Cost

113

The cost for the baseline task.

Baseline6Duration

114

The duration for the baseline task, in minutes.

Baseline6Finish

115

The finish date for the baseline task.

Baseline6FixedCost

116

The fixed cost of any non-resource expense for the baseline task.

Baseline6FixedCostAccrual

117

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline6Start

118

The start date for the baseline task.

Baseline6Work

119

The total person-hours scheduled for the baseline task, in minutes.

Baseline7BudgetCost

120

The budget cost for the baseline task.

Baseline7BudgetWork

121

The budget work for the baseline task, in hours.

Baseline7Cost

122

The cost for the baseline task.

Baseline7Duration

123

The duration for the baseline task, in minutes.

Baseline7Finish

124

The finish date for the baseline task.

Baseline7FixedCost

125

The fixed cost of any non-resource expense for the baseline task.

Baseline7FixedCostAccrual

126

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline7Start

127

The start date for the baseline task.

Baseline7Work

128

The total person-hours scheduled for the baseline task, in minutes.

Baseline8BudgetCost

129

The budget cost for the baseline task.

Baseline8BudgetWork

130

The budget work for the baseline task, in hours.

Baseline8Cost

131

The cost for the baseline task.

Baseline8Duration

132

The duration for the baseline task, in minutes.

Baseline8Finish

133

The finish date for the baseline task.

Baseline8FixedCost

134

The fixed cost of any non-resource expense for the baseline task.

Baseline8FixedCostAccrual

135

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline8Start

136

The start date for the baseline task.

Baseline8Work

137

The total person-hours scheduled for the baseline task, in minutes.

Baseline9BudgetCost

138

The budget cost for the baseline task.

Baseline9BudgetWork

139

The budget work for the baseline task, in hours.

Baseline9Cost

140

The cost for the baseline task.

Baseline9Duration

141

The duration for the baseline task, in minutes.

Baseline9Finish

142

The finish date for the baseline task.

Baseline9FixedCost

143

The fixed cost of any non-resource expense for the baseline task.

Baseline9FixedCostAccrual

144

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Baseline9Start

145

The start date for the baseline task.

Baseline9Work

146

The total person-hours scheduled for the baseline task, in minutes.

BaselineBudgetCost

147

The budget cost for the baseline task.

BaselineBudgetWork

148

The budget work for the baseline task, in hours.

BaselineCost

149

The cost for the baseline task.

BaselineDuration

150

The duration for the baseline task, in minutes.

BaselineFinish

151

The finish date for the baseline task.

BaselineFixedCost

152

The fixed cost of any non-resource expense for the baseline task.

BaselineFixedCostAccrual

153

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

BaselineStart

154

The start date for the baseline task.

BaselineWork

155

The total person-hours scheduled for the baseline task, in minutes.

BudgetCost

156

The budget cost for the task.

BudgetWork

157

The budget work for the task, in hours.

TaskCalendarGUID

158

The GUID of the task calendar.

ConstraintDate

159

A constraint date for the task.

ConstraintType

160

A constraint type for the task: As Soon As Possible = 0, As Late As Possible = 1, Must Start On = 2, Must Finish On = 3, Start No Earlier Than = 4, Start No Later Than = 5, Finish No Earlier Than = 6, Finish No Later Than = 7.

Cost1

161

A cost field of the task.

Cost10

162

A cost field of the task.

Cost2

163

A cost field of the task.

Cost3

164

A cost field of the task.

Cost4

165

A cost field of the task.

Cost5

166

A cost field of the task.

Cost6

167

A cost field of the task.

Cost7

168

A cost field of the task.

Cost8

169

A cost field of the task.

Cost9

170

A cost field of the task.

Date1

171

A date field of the task.

Date10

172

A date field of the task.

Date2

173

A date field of the task.

Date3

174

A date field of the task.

Date4

175

A date field of the task.

Date5

176

A date field of the task.

Date6

177

A date field of the task.

Date7

178

A date field of the task.

Date8

179

A date field of the task.

Date9

180

A date field of the task.

Deadline

181

The deadline for a task.

Duration1

182

A duration field of the task.

Duration10

183

A duration field of the task.

Duration2

184

A duration field of the task.

Duration3

185

A duration field of the task.

Duration4

186

A duration field of the task.

Duration5

187

A duration field of the task.

Duration6

188

A duration field of the task.

Duration7

189

A duration field of the task.

Duration8

190

A duration field of the task.

Duration9

191

A duration field of the task.

Duration

192

A duration field of the task.

EarnedValueMethod

193

The method for calculating earned value for the task.

FinishSlack

194

The duration between the Early Finish and Late Finish dates for the task, in minutes.

FixedCost

195

The fixed cost for the task.

FixedCostAccrual

196

The accrual method that defines how the baseline task accrues fixed costs: Accrues when the task starts = 1, accrues when the task ends = 2, accrues as the task progresses (prorated) = 3.

Flag10

197

A Boolean flag field for the task.

Flag1

198

A Boolean flag field for the task.

Flag11

199

A Boolean flag field for the task.

Flag12

200

A Boolean flag field for the task.

Flag13

201

A Boolean flag field for the task.

Flag14

202

A Boolean flag field for the task.

Flag15

203

A Boolean flag field for the task.

Flag16

204

A Boolean flag field for the task.

Flag17

205

A Boolean flag field for the task.

Flag18

206

A Boolean flag field for the task.

Flag19

207

A Boolean flag field for the task.

Flag2

208

A Boolean flag field for the task.

Flag20

209

A Boolean flag field for the task.

Flag3

210

A Boolean flag field for the task.

Flag4

211

A Boolean flag field for the task.

Flag5

212

A Boolean flag field for the task.

Flag6

213

A Boolean flag field for the task.

Flag7

214

A Boolean flag field for the task.

Flag8

215

A Boolean flag field for the task.

Flag9

216

A Boolean flag field for the task.

FreeSlack

217

The amount of time that the task can be delayed without delaying its successor tasks.

HasRollupSubTasks

218

Indicates whether the task has rollup subtasks.

ID

219

The index of the selected task. After the project summary task, the index of the first task in a project is 1.

Name

220

The name of the task.

Notes

221

The text value of the notes regarding the task.

Number1

222

A number field for the task.

Number10

223

A number field for the task.

Number11

224

A number field for the task.

Number12

225

A number field for the task.

Number13

226

A number field for the task.

Number14

227

A number field for the task.

Number15

228

A number field for the task.

Number16

229

A number field for the task.

Number17

230

A number field for the task.

Number18

231

A number field for the task.

Number19

232

A number field for the task.

Number2

233

A number field for the task.

Number20

234

A number field for the task.

Number3

235

A number field for the task.

Number4

236

A number field for the task.

Number5

237

A number field for the task.

Number6

238

A number field for the task.

Number7

239

A number field for the task.

Number8

240

A number field for the task.

Number9

241

A number field for the task.

ScheduledDuration

242

The scheduled (as opposed to actual) duration of the task.

ScheduledFinish

243

The scheduled (as opposed to actual) finish date of the task.

ScheduledStart

244

The scheduled (as opposed to actual) start date of the task.

OutlineLevel

245

The level of the task in the outline hierarchy.

OvertimeCost

246

The overtime cost for the task.

OvertimeWork

247

The overtime work for the task.

PercentComplete

248

The percent complete status of the task.

PercentWorkComplete

249

The percentage of work completed for the task.

Predecessors

250

The IDs of the task's predecessors.

PreleveledFinish

251

The finish date of a task before leveling occurred.

PreleveledStart

252

The start date of a task before leveling occurred.

Priority

253

The priority of the task, with values from 0 (low) to 1000 (high). The default priority value is 500.

Active

254

Indicates whether the task is active.

Critical

255

Indicates whether the task is on the critical path.

Milestone

256

Indicates whether the task is a milestone.

OverAllocated

257

Indicates whether any assignments for a task are overallocated.

IsRollup

258

Indicates whether subtask information is rolled up to the summary task bar.

Summary

259

Indicates whether the task is a summary task.

RegularWork

260

The amount of regular work for the task.

RemainingCost

261

The remaining cost for the task.

RemainingDuration

262

The remaining duration for the task, in minutes.

RemainingOvertimeCost

263

The remaining overtime cost for the task.

RemainingWork

264

The remaining work for the task, in minutes.

ResourceNames

265

The names of the resources assigned to a task.

ResourceNames_deprecated

266

The names of the resources assigned to a task.

Cost

267

The total cost of the task.

Finish

268

The finish date of the task.

Start

269

The start date of the task.

Work

270

The total person-hours scheduled for the task, in minutes.

StartSlack

271

The duration between the Early Start and Late Start dates for the task.

Status

272

The status of the task: Complete = 0, on schedule = 1, late = 2, future task = 3, status not available = 4.

Successors

273

The IDs of the task's successors.

StatusManager

274

The enterprise resource responsible for accepting or rejecting assignment progress updates for the task.

TotalSlack

275

The total slack time for the task, in minutes.

TaskGUID

276

The GUID of the task.

Type

277

The way the task is calculated: Fixed units = 0, fixed duration = 1, fixed work = 2.

WBS

278

The work breakdown structure code of the task.

WBSPREDECESSORS

279

The work breakdown structure codes of the task predecessors, separated by the list separator.

WBSSUCCESSORS

280

The work breakdown structure codes of the task successors, separated by the list separator.

WSSID

281

The ID of the task in a SharePoint list, for a project that is synchronized with a SharePoint tasks list.

A ProjectTaskFields constant can be used as a parameter of the getTaskFieldAsync method.

For more information about working with fields in Project, see the Available fields reference. In Project Help, search for Available fields.

Supported clients

Project Standard 2013, Project Professional 2013, and Project 2013 SP1

Library

Project-15.js

Namespace

Office