Application.ResourceCalendarEditDays Method (Project)

Edits days in a resource calendar.

expression .ResourceCalendarEditDays(ProjectName, ResourceName, StartDate, EndDate, WeekDay, Working, Default, From1, To1, From2, To2, From3, To3, From4, To4, From5, To5)

expression A variable that represents an Application object.

Parameters

Name

Required/Optional

Data Type

Description

ProjectName

Required

String

The name of the project containing the resource calendar to edit.

ResourceName

Required

String

The name of the resource to edit.

StartDate

Optional

Variant

The first date to edit.

EndDate

Optional

Variant

The last date to edit.

WeekDay

Optional

Long

The weekday to edit. If StartDate and EndDate are specified, WeekDay is ignored. Can be one of the PjWeekday constants.

Working

Optional

Boolean

True if the days are working days. If Default is True, Working is ignored.

Default

Optional

Boolean

True if the resource calendar uses the values in the corresponding base calendar as defaults. The default value is False.

From1

Optional

Variant

The start time of the first shift.

To1

Optional

Variant

The end time of the first shift.

From2

Optional

Variant

The start time of the second shift.

To2

Optional

Variant

The end time of the second shift.

From3

Optional

Variant

The start time of the third shift.

To3

Optional

Variant

The end time of the third shift.

From4

Optional

Variant

The start time of the fourth shift.

To4

Optional

Variant

The end time of the fourth shift.

From5

Optional

Variant

The start time of the fifth shift.

To5

Optional

Variant

The end time of the fifth shift.

Return Value

Boolean

The ResourceCalendarEditDays method returns a trappable error (error code 1101) when applied to material resources.