WorkFormat Element

This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.

The default format for work duration values.

<WorkFormat>
  IntegerValue
</WorkFormat>

Parent Elements

Project

Occurrences

Minimum: 0

Maximum: 1

Text Value

A text value of type Integer is required.

Value

Description

1

m (minutes)

2

h (hours, default))

3

d (days)

4

w (weeks)

5

mo (months)

See Also

Concepts

Project Elements and XML Structure

XML Schema for the Project Element