Export (0) Print
Expand All
And
Day
End
ID
Ids
Not
Or
SID
To
UID
URL
Expand Minimize
This topic has not yet been rated - Rate this topic

CompleteDate

The CompleteDate element represents the date on which a task was completed.


<CompleteDate/>

DateTime

The following sections describe attributes, child elements, and parent elements.

Attributes

None.

Child Elements

None.

Parent Elements

Element

Description

Task

Represents a task in the Exchange store.

A text value that represents the date and time is required if this element is used.

Setting CompleteDate has the same effect as setting PercentComplete to 100 or Status to Completed. In a request that sets at least two of these properties, the last processed property will determine the value that is set for these elements. For example, if PercentComplete is 100, CompleteDate is January 1, 2007, and Status is NotStarted, and the properties are streamed in that order, the effect will be to set the Status of the task to NotStarted, the CompleteDate to null, and PercentComplete to 0.

The schema that describes this element is located in the EWS virtual directory of the computer that is running MicrosoftExchange Server 2007 that has the Client Access server role installed.

Namespace

http://schemas.microsoft.com/exchange/services/2006/types

Schema Name

Types schema

Validation File

Types.xsd

Can be Empty

False

Did you find this helpful?
(1500 characters remaining)
Thank you for your feedback
Show:
© 2014 Microsoft. All rights reserved.