Export (0) Print
Expand All
And
App
Day
End
ID
Ids
Not
Or
SID
To
TTL
UID
Url
Expand Minimize

CompleteDate

Last modified: October 13, 2012

Applies to: Exchange Online | Exchange Server 2007 | Exchange Server 2010 | Exchange Server 2013 | Office 365

The CompleteDate element represents the date on which an item was completed.


<CompleteDate/>

DateTime

The following sections describe attributes, child elements, and parent elements.

Attributes

None.

Child elements

None.

Parent elements

Element

Description

Task

Represents a task in the Exchange store.

Flag

Specifies a flag on a mailbox item.

A text value that represents the date and time is required if this element is used.

Setting CompleteDate has the same effect as setting PercentComplete to 100 or Status to Completed. In a request that sets at least two of these properties, the last processed property will determine the value that is set for these elements. For example, if PercentComplete is 100, CompleteDate is January 1, 2007, and Status is NotStarted, and the properties are streamed in that order, the effect will be to set the Status of the task to NotStarted, the CompleteDate to null, and PercentComplete to 0.

The schema that describes this element is located in the EWS virtual directory of the computer that is running MicrosoftExchange Server 2007 that has the Client Access server role installed.

Namespace

http://schemas.microsoft.com/exchange/services/2006/types

Schema Name

Types schema

Validation File

Types.xsd

Can be Empty

False

Show:
© 2014 Microsoft